Skybrokers
(http://sky-brokers.com) delivered and installed an used and
refurbished Vertex 9.0m earth station antenna with a Scientific Atlanta
(Viasat) 10m Pedestal mount in Usingen (Frankfurt Area), Germany. The
installation was successfully performed by a two-member installation team and
took 3.5 weeks in November 2017. Watch the installation video!
Posts tonen met het label 9m earth station antenna. Alle posts tonen
Posts tonen met het label 9m earth station antenna. Alle posts tonen
02-02-2017
De-installation of a VertexRSI 9m antenna in Vienna
In December 2016 our team dismantled a Vertex 9m antenna in Vienna, Austria. A challenging project since we had to de-install in the air due to limited space. With special equipment and trucks we finished the job in less then one week!
15-10-2016
Finishing an installation of a VertexRSI 9m antenna in Nuuk, Greenland
Due to deteriorating weather conditions Skybrokers team is finishing a 9m Earth Station Antenna on a Mountain in Nuuk, Greenland.
Finishing an installation of a VertexRSI 9m antenna in Nuuk, Greenland
Due to deteriorating weather conditions Skybrokers team is finishing a 9m Earth Station Antenna on a Mountain in Nuuk, Greenland.
28-09-2016
Nuuk in Greenland!
Here is another antenna project we are working on! Skybrokers delivered a used VertexRSI 9m antenna to Greenland Television. The antenna was refurbished in our facility in Europe and shipped by container overseas to Nuuk in Greenland. With remote support from us the customer did the majority of the assembly of the antenna that is placed on a hill.
Skybrokers technicians will align the main reflector and test the antenna in the next weeks.
Here is another antenna project we are working on! Skybrokers delivered a used VertexRSI 9m antenna to Greenland Television. The antenna was refurbished in our facility in Europe and shipped by container overseas to Nuuk in Greenland. With remote support from us the customer did the majority of the assembly of the antenna that is placed on a hill.
Skybrokers technicians will align the main reflector and test the antenna in the next weeks.
![]() |
12-09-2016
Refurbished RSI (VertexRSI) 9.2m antenna for GuyaCom
Work in progress! Skybrokers delivered a RSI 9.2m Earth Station antenna to French Guiana last month. This antenna was completely refurbished in our facility in Europe, we added new hardware kits and motors with gearboxes and checked out the whole system before loading into a 40ft sea-container. The customer could perform an excellent installation.
On September 12th the reflector was lifted onto the tripod mount successfully. Coming days the installation will be completed and the antenna will be put in operation.
24-05-2016
Skybrokers delivered an used and refurbished Vertex 9m Earth Station antenna to DISH TV in India. The client was satisfied and happy with the quality of the refurbishment after his visit to our facility in Europe. We provided new motors and gearboxes as well as new jack boots, checked out and completed hardware kits. Out team loaded the antenna in a 40ft sea container and the customer was involved with installation.
07-11-2015
22-10-2015
Skybrokers de-installing a Viasat 11m Antenna in the UK
Our team has de-installed a Viasat 11m antenna at a Teleport in Redditch, UK. The team spend three weeks to dismantle, pack and loading of this antenna. It will be transported back to our facility for full refurbishment. Check the video we made of the lifting:
26-01-2015
Skybrokers (http://sky-brokers.com) de-installed an Andrew 7.6m Earth Station Antenna in the UK, January 2015. The de-installation was performed by our two member installation team and took 5 days including loading in a truck.
The antenna will be checked out and refurbished in our facility in Europe.
21-12-2014
31-03-2014
Finishing a Vertex 11m C-band earth station antenna and a Vertex 8m Ku-band earth station antenna in Vilnius Lithuania. We (www.sky-brokers.com) are currently performing the theodolite of both antennas that we delivered a few weeks ago. The 11m was done quickly without any problems. Now we are working on the 8m. The reflector will be lifted on its pedestal this afternoon (March 31st, 2014).
Working on the video of the installations. These will be on YouTube soon! Stay tuned.
Working on the video of the installations. These will be on YouTube soon! Stay tuned.
11-03-2014
Video of an installation of a Vertex 9m Earth Station antenna
We made a video of the Vertex 9m earth station antenna installation at Talia in Raisting, Germany. Please see it on YouTube!
06-03-2014
Installation of a Vertex 9m earth station antenna in Germany
This week we (www.sky-brokers.com) will finish the refurbished 9m Vertex earth station antenna in Raisting, Germany. We had a bit of a delays due delay in parts arrival due to the weather condition in the USA. Our freight agent could not get our ordered parts in time in the aircraft carrier. We had to stop the installation with a two week pause. But our engineers work hard to get the antenna up and running now.
Currently the reflector and its sub is being aligned and it looks promising. The weather conditions in Munich area are very good (17degr C).
Currently the reflector and its sub is being aligned and it looks promising. The weather conditions in Munich area are very good (17degr C).
05-02-2014
Installation of a refurbished Vertex 9m earth Station antenna in Germany
Skybrokers installation team is currently installing a refurbished Vertex 9m Earth Station antenna in Raisting (Munich area Germany). Local weather conditions are good and we are making very good progress. We still are waiting for parts from our US suppliers, but deliveries are a bit delayed due to the bad weather at the other side of the Atlantic.
We started on Tuesday Feb 4th and we expect to have the antenna aligned this weekend! The rest of next week we spend on installing the de-icing and closure, the electrical circuit, motorization and indoor equipment. Hope to be ready mid of February for moving to the next installation. Stay tuned!
We started on Tuesday Feb 4th and we expect to have the antenna aligned this weekend! The rest of next week we spend on installing the de-icing and closure, the electrical circuit, motorization and indoor equipment. Hope to be ready mid of February for moving to the next installation. Stay tuned!
Abonneren op:
Posts (Atom)
















